New Bus User Group for South Wealden and Eastbourne

Guest Blog by David Everson

The importance of bus services in and around Eastbourne was a major topic at the initial meeting of the Eastbourne Area Bus Users Group (EABUG). This event took place in Eastbourne Town Hall on 16th October 2024. The group is an initiative of the Eastbourne Eco Action Network (EEAN). It aims to provide an interface between bus users, bus companies and local authorities. EABUG plans to meet three times a year.

Prominent among those present were representatives of local bus companies, Stagecoach, Brighton & Hove and Cuckmere buses. Also present were representatives of local disability groups, local and county councillors plus members of the public.

Jill Shacklock and David Everson (EEAN) both highlighted the need for good bus services. This was for those who could not drive or afford to drive, school children, those with disabilities or the elderly. They also emphasised the need to develop good sustainable transport systems.

East Sussex CC

A member of the East Sussex  Bus Team, Donnalyn Morris, gave an update on a variety of infrastructure projects that had been taking place in Eastbourne and Friston. Work on the Hailsham Mobility Hub was yet to start, with discussions currently taking place with Tesco about the project. The consultation about the proposed Bus Priority measures along Seaside and St Anthony’s in Eastbourne had now completed and a decision would be made in November.

Stagecoach

Matthew Arnold, Commercial Director, Stagecoach South East expressed concern over the detrimental effect that congestion had on bus punctuality and highlighted problems in Eastbourne. He described  these as the worst in the south east. He stated that car traffic was up 15% on pre Covid levels whilst bus passenger numbers had only risen to 94% of pre-Covid usage.

In addition, he also stated that buses were hindered by lack of co-ordination in the planning of roadworks. There needed to be more advance information sharing between ESCC and utility companies.

Brighton & Hove

Ben Garcia, from Brighton and Hove Buses, informed the meeting of recent improvements to their bus services. They are now a UK lead when it comes to inclusivity on their buses. They have dementia friendly seating and their drivers are trained to be ‘Dementia Friends’. All their buses are ‘talking buses’.

Cuckmere

Nick Price from Cuckmere Buses informed the meeting that their operation of eight, 16 seater buses were all driven by volunteers and that their new timetables would be published soon.

The main body of the meeting involved presentations, discussions and workshops about ‘Accessible Information’ on buses. New legislation requires most buses to provide information to passengers about the bus number and route and next stop information. Importantly the information must be given both visually and aurally. The new legislation came into force on 1st October 2024 for buses registered after October 2019. Older buses that need to be retrofitted with display boards and sound systems must be accessible by October 2026.

Using Apps

During the meeting there was a short presentation on how to use both Stagecoach and Brighton & Hove Bus Apps. QR codes were also highlighted as a quick means of accessing information at bus stops. A limiting factor for both of these sources of information is the necessity to have a Smart phone to access it.

Next Meeting

The next meeting of EABUG is planned for February 2025.

For further details please visit – Eastbourne ECO Action Network.

https://ecoactioneb.co.uk/about/eastbourne-area-bus-user-group

Email : bususereastbourne@gmail.com

David Everson

(Chair EEAN Transport Group)

Commenting on Wealden Local Plan

Introduction

Whether you live in Wealden or on the borders of Eastbourne, Lewes or Rother additional housing growth, in the Wealden area, will affect you. So you should comment on the Draft Local Plan.

“Wealden District Council is preparing a new Local Plan. [it] will be the key planning document for Wealden District. Once adopted, the Local Plan will form part of the Development Plan for the District, replacing all existing local plan policies and will be used to assess and make decisions on planning applications.” There will be 16,000 new houses of which around 8,000 have already been planned for .

It is a challenge to go through all the background documentation. The consultation itself is over 200 pages. So this blog has had to be selective. To begin with here are the top 8 areas in terms of new housing

Most of this will be in South Wealden and especially on the borders of Eastbourne. From this table you can see that much of the local area is already ‘confirmed’. In Willingdon for example all the space is already committed apart from some ‘windfall’. So you may feel it is too late. This is not the case. Within the plan are some policies that have some merit and these should be supported.

Here are some links you will need . The Wealden Local Plan itself including a short video . Then the Consultation Portal – Where you create an account and add comments

Background

The lack of a local plan has made Wealden vulnerable to developers who were likely to win, if they appealed, when their planning submission was rejected. With a plan the council has more control of where housing can go. Without a plan the growth of housing could be higher. If there is a proposed housing development ,that you do not agree with, then you can highlight this in your submission, ideally linking it to the relevant policy.

One of the key concerns is the transport infrastructure. Before reading the rest of the blog you may wish to read this blog, on how over optimistic future predictions , are used by councils and developers to the detriment of residents.

Discussions with relevant district officers, councillors and directors suggest there may be residents who do not support a greener and more active travel agenda . Therefore it is important to support these policies and schemes.

Below are a number of the key chapters in the consultation that are worth commenting on. :-

Chapter 3 is Vision and Objectives

Suggest you strongly support “Sustainable and active travel’ but make points as to how this is not being addressed.

There has been no evidence of any increase in public transport, wheeling, cycling and walking. Many County, District and Borough plans refer to a planned shift away from cars . This has never been delivered. In fact East Sussex CC has not achieved any change in the mix of transport and total vehicle trips have simply increased

Suggest the need for high level plans across multiple sites. There are many examples where each site has its own access road and no attempt made to have public or active travel routes through these developments . For example at Horsebridge there is an area with over 5 different adjacent estates with no co-ordination of the access across them. A house that you want to visit, maybe only a few hundred meters away, but the car may need to exit one estate and then enter another one. On top of this the connections to the Cuckoo Trail, tell cyclists to dismount and push over 200m on sandy narrow tracks to get to the estates. Discriminatory especially to those who use mobility scooters, elderly or with heavy e-bikes

There needs to be a clear strategy to deal with the effect of all this housing growth on the current residents, where the existing streets might have more ‘permeability’ and could then be used as ‘rat runs’.

Plus stress more emphasis needed on actively supporting greater biodiversity, perhaps in adjacent areas, to counteract the consequences of this extra urban housing. Perhaps though Section 106 agreements.

There does not seem to be enough on encouraging reaching net zero through the design of housing in terms of their location and the wider community. This would strongly support higher insulation, solar panels, EV charging and heat pumps

Chapter 4 – Spatial Strategy

Suggest you strongly support “4.18 The benefits of a 20-minute neighbourhood concept are extensive, providing health, social, environmental and economic benefits to people and communities. Additionally, the concept would seek to tackle many of the issues that we need to address through our plan such as reducing carbon emissions, helping people to become more active, reducing mental health issues and loneliness, improving our town and village centres, making our settlements great places to live as well as improving access to affordable healthy food.

Support the statement in “4.26 East Sussex County Council’s Local Transport Plan 4 Consultation(12) supports the 20-minute neighbourhood or the ‘complete, compact and connected neighbourhood’ approach by providing a shift towards supporting healthy lifestyles by walking, wheeling or cycling and more active travel, as well as through the design of public places and healthy places through integrated neighbourhoods.

So from the above, mention your support for higher density dwellings in the centres which should have access to a mix of leisure, shopping and business all nearby and accessible by bus or active travel. You could also add support for 20 mph and school streets

Support – “Policy SS9: Health, Wellbeing and Quality of Life”that creates improved connectivity and supports healthier and more active lifestyles

Chapter 5 – ‘Climate Change’

Generally strongly support

CC1 Net Zero Development Standards – New Build. Support Policy but would prefer a clearer steer around residential standards of insulation, solar, batteries and heat pumps. There are no examples locally which could be seen as evidence of the ideal higher standards

CC4 Carbon sequestration, Support Policy but make the point, large areas of land are being urbanised and it is unlikely that sequestration could be achieved in or around the new housing estates

Policy CC5: Renewable and Low Carbon Energy. Agree with the principle of “Support will be given to community led energy schemes where evidence of community support can be demonstrated”

Policy CC6 Water Efficiency . Support the principles though make the point it is partly the cumulative effect of all these new houses which will determine how both water and waste (Southern and South East Water) cope. Some of the pumping stations, pipes and sewage works are already under strain

Policy CC7 Managing Flood Risk. Support the principle though areas such as between Polegate and Willingdon have always been susceptible to flooding. Concreting over will add to the problem across all the low lying estates. Make reference to the work the Environment Agency are undertaking around flooding and rising sea level.

Policy CC8 Sustainable Drainage. Support the principle such as in CC7 but perhaps question whether previous experience shows if this been dealt with in the past

Chapter 9 Infrastructure

Policy INF1 Infrastructure provision, delivery, and funding. “The provision of infrastructure facilities such as those relating to healthcare and education should be provided” Stress there needs to be guarantees of them being built and that you have concerns based on recent sites that the delivery of schools and health centres may not happen. This is due to the higher build costs and the funds that health and education may have. Plus a need to adhere to DfT’s “Guidance on Land Use/Transport Interaction Models”

Policy INF2 Sustainable transport and active travel– Support this policy. However the local housing developments simply fail on the criteria listed. No attempt appears to have new been made to create viable routes through multiple estates . Routes identified in the LCWIP, that are supposed to be on these sites ,have not been taken into consideration. Good examples would be alongside the railway from Hampden Park to Polegate (such as routes 312 and 225). Recent experience shows that proposed bus and cycle lanes are very vulnerable to being dropped through pressure from those who do not support them. They must be installed.

Policy INF5 Safeguarding of Infrastructure– Support the concept but as already mentioned there are many potential active travel routes in LCWIP that have been ignored through planning.

Policy INF8 Open space, sports and recreation provision– Suggest make the point – There are large areas of open land that have been lost and this cannot be rectified by a few small parks

Chapter 10 Design

Policy DE1 Achieving well-designed and high-quality places. Support the aim however challenge most of the new developments. These are car centric, low traffic neighbourhoods that do not allow through traffic. Most of the current developments have similar housing and add very few community buildings. The road layouts are meandering and do not support more direct routes for active travel . They also do not support bus routes and this will mean when funding runs out residents without a car will struggle. Perhaps building housing for elderly people should be closer to amenities and bus routes on main roads. In ‘Manual for Streets’ it explains the consequences of building ‘car-centric’ estates that make active travel within the estate and to other destinations problematic

Closing comments.

Please read any other chapters and additional documents, if you want to look into this plan in more detail. You have until Friday 10th May 2024 to submit your comments